Contents

EXECUTIVE SUMMARY  Error! Bookmark not defined.

1     INTRODUCTION  Error! Bookmark not defined.

2     AIR QUALITY  Error! Bookmark not defined.

3     NOISE  Error! Bookmark not defined.

4     WATER QUALITY  Error! Bookmark not defined.

5     ECOLOGY MONITORING   Error! Bookmark not defined.

6     LANDSCAPE AND VISUAL  Error! Bookmark not defined.

7     LAND CONTAMINATION  Error! Bookmark not defined.

8     SITE INSPECTION AND AUDIT  Error! Bookmark not defined.

9    NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS  Error! Bookmark not defined.

10    IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE  Error! Bookmark not defined.

11    FUTURE KEY ISSUES  Error! Bookmark not defined.

12    CONCLUSION AND RECOMMENDATION  Error! Bookmark not defined.

 

Tables

Table 1            Contact Information of Key Personnel Error! Bookmark not defined.

Table 2            Environmental Licenses, Notification and Permits Summary. Error! Bookmark not defined.

Table 3            Air Quality Monitoring Equipment Error! Bookmark not defined.

Table 4            Air Quality Monitoring Location. Error! Bookmark not defined.

Table 5            Summary of Air Quality Monitoring Results. Error! Bookmark not defined.

Table 6            Comparison of 1-hr TSP data with EIA predictions. Error! Bookmark not defined.

Table 7            Construction Noise Monitoring Equipment Error! Bookmark not defined.

Table 8            Monitoring Parameters and Frequencies of Noise Monitoring. Error! Bookmark not defined.

Table 9            Construction Noise Monitoring Location. Error! Bookmark not defined.

Table 10           Summary of Construction Noise Monitoring Results. Error! Bookmark not defined.

Table 11           Comparison of Noise monitoring data with EIA predictions. Error! Bookmark not defined.

Table 12           Water Quality Monitoring and Sampling Equipment Error! Bookmark not defined.

Table 13           Monitoring Parameters and Frequency. Error! Bookmark not defined.

Table 14           Coordinates of Water Quality Monitoring Locations. Error! Bookmark not defined.

Table 15           Summary of Water Quality Exceedance. Error! Bookmark not defined.

Table 16           Noise Monitoring Parameters (For Active Ardeid Night Roost Survey) Error! Bookmark not defined.

Table 17           Active Ardeid Night Roost Survey Findings. Error! Bookmark not defined.

Table 18           Noise Monitoring Parameters (For Active Ardeid Night Roost Survey) Error! Bookmark not defined.

Table 19           Noise Monitoring Parameters. Error! Bookmark not defined.

Table 20           Abundance of all Avifauna Species. Error! Bookmark not defined.

Table 21           Abundance of Species of Conservation Importance. Error! Bookmark not defined.

Table 22           Shannon Diversity Index Value of all Avifauna Species. Error! Bookmark not defined.

Table 23           Shannon Diversity Index Value of Species with Conservation Importance. Error! Bookmark not defined.

Table 24           Wetland habitat utilization of all avifauna species. Error! Bookmark not defined.

Table 25           Wetland habitat utilization of avifauna species of conservation importance. Error! Bookmark not defined.

Table 26           Noise Monitoring Results (For Ecological Monitoring of Birds) Error! Bookmark not defined.

Table 27           Waste Generated by the Construction and Disposal Ground. Error! Bookmark not defined.

Table 28           Status of submissions required under the EP. Error! Bookmark not defined.

 

 Figures

Figure 1           Location of Proposed Yuen Long Effluent Polishing Plant Error! Bookmark not defined.

Figure 2           Location of Construction Dust Monitoring Stations. Error! Bookmark not defined.

Figure 3           Noise Monitoring Locations. Error! Bookmark not defined.

Figure 4           Water Quality Monitoring Locations. Error! Bookmark not defined.

Figure 5           Ecology Monitoring Locations. Error! Bookmark not defined.

 

Appendix

Appendix A     Construction Programme

Appendix B     Project Organization Chart

Appendix C     Action and Limit Levels

Appendix D     Calibration Certificates/ Reports of Monitoring Equipment

Appendix E     Environmental Monitoring Schedule

Appendix F     Environmental Monitoring Results

Appendix G     Wind Data

Appendix H     Event and Action Plan

Appendix I      Waste Flow Table

Appendix J     Implementation Status of Environmental Mitigation Measures

Appendix K     Weather and Meteorological Conditions

Appendix L     Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions

Appendix M    Summary of the ET Leader’s Site Environmental Audit in the Reporting Month

Appendix N     Outstanding Issues and Deficiencies

Appendix O    Active Night Roost Monitoring Area and Vantage Points; and Noise Monitoring Stations

Appendix P    Ecological Bird Monitoring Area with Locations of Point Count Sites and Transect Route